SMA tech testing to run an electric valve actuator to replace wellsite pneumatic vent devices (field test)

SMA tech testing to run an electric valve actuator to replace wellsite pneumatic vent devices (field test)

Kinitics electric valve actuators were deployed onto a natural gas well near Edson, Alberta. After the actuators indicated a setup issue with the power system, the issue was corrected and the actuators were run through a 3-month evaluation period. The actuators automated the separator package effectively and continue to do so, with no unintentional shutdowns or incidents caused by Kiniticsequipment. Over 10,000 actuations and 160 days of operation has been recorded so far on the Kinitics equipment, and approximately 6,500m3 of natural gas produced.

At NGIF, we invest in companies who are leading in the development of clean technologies for energy and who have the potential to demonstrate significant and quantifiable environmental and economic returns.

Contact us
Image
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link
close-link